During a tight six week deadline we ran refurbishment projects at two sites for Streatham and Clapham Junior School and High School. The Junior School was an extensive renovation including structural work and a complete school canteen refurbishment
We used diamond cutting specialists to knock through a wall in the canteen to open the space up and installed steel goal posts to support the new structure. The school canteen refurbishment also required bespoke tables to fit with the existing pillars. We designed a new flooring scheme with coloured vinyl to create different zones and help ensure lunchtimes run smoothly. A new servery was built and redecorated throughout. Elsewhere in the school we redecorated classrooms and replaced the floors, ceilings and doors.
At the High school site we refurbished four large classrooms. The rooms were redecorated and new ceilings were built with LED lighting. Ash doors were fitted and White Rock panelling was added to the bottom half of the walls to allow the walls to be easily cleaned.